Railway bridges on the Bothnia Railway Line
Product information
This environmental product declaration (EPD) describes, from a lifecycle perspective, the total environmental impact of railway bridges on the Bothnia Line. The EPD covers bridge "substructure" only. Track, power, signalling and telecom systems on the bridges are not included.
The aim of this EPD is that it should provide experts and scientists (in the construction and infrastructure sectors) with objective and reliable information on the environmental impact of constructing, operating and maintaining railway bridges.
Detailed information
Registration number:
S-P-00199
Status:
Registered
Registration date:
March 19, 2010
Version date:
November 6, 2014
Valid until:
November 6, 2017
Geographical scopes:
Sweden
Company information
Company Name:
Swedish Transport Administration (Trafikverket)
Country:
Sweden
Contact:
Website:
Included products in this EPD
Download documents
S-P-00199 EPD Railway bridges on the Bothnia LineUse this QR code to link directly to this page