EPD-IES-0018599:001
Electricity
The electricity product system studied starts with upstream processes, including natural gas production and transportation via barge tanker. Core processes covering main electricity generation and ancillary processes. Downstream processes including electricity transmission and distribution by National Electricity Company (PLN) to the consumers. The LCA study held by PT PLN Nusantara Power UP Muara Karang has included 100% of the electricity produced in 2022.
| Registration number | EPD-IES-0018599:001 |
|---|---|
| Status | Valid |
| Initial version date | 2025-02-17 |
| Validity date | 2030-02-16 |
| PCR | 2007:08 Electricity, steam and hot/cold water generation and distribution 5.0.0 |
| Standards conformance | ISO 14025:2006 |
| Licensee | EPD Southeast Asia |
| Geographical scope | Indonesia |