EPD-IES-0019716:002

Electricity from PT PLN Indonesia Power UBP Bali Unit PLTGU Pemaron

Electricity accroding to EN 15804. PT PLN Indonesia Power UBP Bali PLTGU Pemaron Unit, relying on two gas turbine units, each with a capacity of 48.8 MW, for a total capacity of 97.6 MW. The plant design utilizes a dual-fuel system, capable of operating with either gas or oil as fuel. Due to gas supply limitations, the unit currently operates using High Speed Diesel (HSD) in northern Bali.

Registration numberEPD-IES-0019716:002
PCR2007:08 Electricity, steam and hot/cold water generation and distribution 5.0.0
StatusValid
Publication date2025-02-17
Valid until2030-02-16
EN 15804 compliantNo
Geographical scopeIndonesia