EPD-IES-0013401:001 (S-P-13401)

Ready-Mixed Concrete "GS402AP3 N40/20/100 Greenstar 3"

The products outlined in this EPD are manufactured at Gunlake’s Banksmeadow plant in the East of Sydney, NSW. The concrete is used in the construction of the University of New South Wales Health Translation Hub (UNSW-HTH) located at UNSW's Randwick campus.

Registration numberEPD-IES-0013401:001 (S-P-13401)
PCR2019:14 Construction products (EN 15804+A2) 1.3.4
c-PCR2019:14-c-PCR-003 Being updated - Concrete and concrete elements (EN 16757) 1.0.0
StatusValid
Publication date2024-05-28
Valid until2029-03-28
EN 15804 compliantYes
Geographical scopeAustralia