EPD-IES-0010494:001 (S-P-10494)

Viaduct - Foundation Piling | C40/50

This environmental product declaration is for 1 cubic metre (m3) of Viaduct Foundation Piling C40/50 ready-mix concrete produced by Tarmac at the following manufacturing facility:

Tarmac BP1 & BP2 at Align JV

Viaduct Foundation Piling C40/50 ready-mix concrete production is managed under Tarmac’s ISO 9001 Quality Management system.

Viaduct Foundation Piling C40/50 ready-mix concrete is used in Align JV & HS2 construction of the Colne Valley Viaduct substructure rotary bored piles.

Registration numberEPD-IES-0010494:001 (S-P-10494)
StatusValid
Version date2024-08-06
Validity date2029-08-05
PCR2019:14 Construction products (EN 15804+A2) (version 1.3.4) 1.3.4
c-PCR2019:14-c-PCR-003 Concrete and concrete elements (EN 16757) 1.0.0
Standards conformance
Geographical scopeUnited Kingdom
LCA Practitionersrob.owen@tarmac.com, Tarmac