EPD-IES-0010494:001 (S-P-10494)
Viaduct - Foundation Piling | C40/50
This environmental product declaration is for 1 cubic metre (m3) of Viaduct Foundation Piling C40/50 ready-mix concrete produced by Tarmac at the following manufacturing facility:
Tarmac BP1 & BP2 at Align JV
Viaduct Foundation Piling C40/50 ready-mix concrete production is managed under Tarmac’s ISO 9001 Quality Management system.
Viaduct Foundation Piling C40/50 ready-mix concrete is used in Align JV & HS2 construction of the Colne Valley Viaduct substructure rotary bored piles.
| Registration number | EPD-IES-0010494:001 (S-P-10494) |
|---|---|
| Status | Valid |
| Version date | 2024-08-06 |
| Validity date | 2029-08-05 |
| PCR | 2019:14 Construction products (EN 15804+A2) (version 1.3.4) 1.3.4 |
| c-PCR | 2019:14-c-PCR-003 Concrete and concrete elements (EN 16757) 1.0.0 |
| Standards conformance | |
| Geographical scope | United Kingdom |
| LCA Practitioners | rob.owen@tarmac.com, Tarmac |