ACCIONA Energía publish EPD of electricity from solar power - Environmental Product Declarations

Log on to environdec

Feb

27, 2018

ACCIONA Energía publish EPD of electricity from solar power

EPD

ACCIONA Energía has published an EPD for Electricity generated in photovoltaic power plant El Romero Solar 196 MW. The plant is located in the Atacama desert in Chile and has a real area of 2.8 million square meters.

The EPD describes the environmental impact from production of raw materials, construction, operation and the future end-of-life. It was verified by Tecnalia R&I Certifcación, S.L.

This is the first EPD of solar power published in the International EPD System, where there previously are company-specific EPDs published for electricity from wind power, hydro power and nuclear power.

 

Further information: